Introduction
The machine is used for open width cotton fabric pre-shrinking process.
At the beginning of overfeed, the cotton fiber will be processed by steaming to increase the humidity and plasticity. Then the fabric will be widened and pre-shrinked in order to reduce shrinkage and get a good soft feature.
Some fabric could be used directly after drying machine processing, and you can get a stable size, qualified shrinkage and soft effect. If the fabric couldn't reach the standard, you can repeat the processing step and obtain satisfactory result.
Based on different fabric width, we can provide the following machine models:
FSLS-2200mm/2400mm (standard)/2600 mm
Based on different heat sources, our machine adopt 3 heat methods:
Steam, Electricity + Oil, Circulation Conducting Oil
Our machine is mainly used for cotton and other natural fibers,
***The machine can NOT be used for synthetic fabrics.
Design Drawing
Representative Type Information Basic Information
Model | FSLS2400 |
Name | Compactor |
Application | Textile-finishing(shrinkage rate:4-5%) |
Suitable Fabric | Open-witdh knitted Fabric,Pure cotton,wool,blended fabric(cotton content>65%) |
Felt Max. Width | 2400mm |
Tentering Max. Width | 2600mm |
Working Speed | 3-35m/min |
Rail Type | Stainless Steel+ Graphite |
Dimension | Approx. (14540*4100*3000mm)L*W*H |
Weight | Approx. 12t |
Compressed Air | 0.35-0.6MPa |
Tentering Working Type | Horizontal Circulating Chain(Stainless Steel Pin Plate & Holder,Pitch:60mm) |
Compacting Type | Felt Belt(Nomex)+ Hot Cylinder, Felt Belt Thickness:20-21mm |
heat source of Hot cylinder | ||||
No | Item | Cylinder Max.Temp | Specification | Consumption |
1 | Electricity heat conduction Oil | 190ºC | Industrial Electricity | 25-54KW |
Saturated Steam for Steam Box | ||||
No | Item | Max.Temp | Specification | Consumption |
1 | Saturated Steam | 140ºC | 3-6Kg/cm² | 100-150kg/h |
Electricity | ||||
No | Item | Specification | Consumption | |
1 | Driving System | Main Motor etc | 21KW |
Production Line
We design and manufacture the components in our workshop.
Shipment Export Package standard
Payment Terms:
Payment Conditions: 30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight.
Delivery time: 30-60 days from the date of receiving down payment. All payment should be received before delivery in China.
OEM and customized acceptable, welcome you to visit our factory!